Work, 02 of 06

Brix

You talk through a job and Brix builds the estimate.

Product. In production. Built for A101 Construction, a remodeling contractor. A phone app, voice first, priced from the contractor's own price book.

The contractor says
Brix hears
bathroomgutmid-gradevanity wall, movefloor, tileabout 40 sq ft
Brix builds
Demo, dumpster, protection3 lines
Framing, plumbing, electrical, drywall4 lines
Floor tile, 40 sq ft4 lines
Mid-grade fixture set8 lines
Paint, trim, permit, supervision4 lines
Priced from A101's own book
The estimate
$0
Itemised, priced, one tap from a proposal.

Then and now.

Before Brix, an estimate was an evening's work: notes from memory in the truck, Excel line by line at the kitchen table, an old proposal retyped in Word, sent the next morning. With Brix the estimate builds during the walk and goes out from the driveway.

Next morningThe walk, then the kitchen table, then the send.
Walk the job2:04 pm, 45 min
Notes from memoryin the truck
Excel, line by line7:40 pm, 60 min
Copy an old jobthe one that's close
Retype into Word40 min
Sendnext morning
2:47 pmSent from the driveway. Built during the walk.
Walk the job2:04 pm, builds as you talk
Review in the truck2:41 pm, 6 min
Send2:47 pm

Walk in. Talk. Estimate. Send.

2:04Brix
Hollis bath
14 Hollis Rd, primary bath
Draft
Estimate, 0 lines$0
Walk the space and talk. Lines will land here.
Hold to talk
Gut the bathroom. Mid-grade finishes. Move the vanity wall, tile the floor, maybe forty square feet.
bathroomgutmid-gradevanity wallfloor tile~40 sq ft
Demo, full bath$1,850
Dumpster and disposal$950
Dust protection$180
Framing, partition, 8 ft$760
Rough plumbing, relocate$1,900
Electrical, relocate$550
Drywall and patch$680
Floor tilearea?
Tub or showerwhich?
9 more lines
Running, 2 open$0
Listening
Brix wasn't told
Floor tile, areaYou said "maybe forty." How many square feet?
40 sq ft60 sq ftType it
Floor tile, 40 sq ft, +$1,460
Wet areaGutting the bath replaces the tub or shower. Which is going in?
Tub and surroundWalk-in shower
Tub and surround, +$5,005
Running estimate$16,745
Demo and prep, 3$2,980
Vanity wall relocation, 4$3,890
Floor tile, 40 sq ft, 4$1,460
Tub and surround, 6$6,655
Shower door, framelessno rate on file
Fixtures and finishes, 8$5,250
Finish, general, 4$4,625
Saved to A101's price book
Estimate$23,210
Build proposal
A101 Construction
Bathroom renovation
14 Hollis Rd, prepared September 2
Demo and prep$2,980
Vanity wall relocation$3,890
Floor tile$1,460
Tub and surround$6,655
Fixtures and finishes$5,250
Finish, permit, supervision$4,625
Total$24,860
To the homeownerSent 2:47 pm
Send to homeowner
Front door, 2:04

Start the job. Estimate: zero.

No drawings, no form to fill in later. The phone stays in one hand and the estimate builds during the walk, not after it.

The bathroom, 2:19

Say what you see.

Every phrase lands twice: as scope, and as the priced lines that scope implies. "Gut the bathroom" is demo, dumpster, and dust protection, priced from the contractor's own book.

The bathroom, still, 2:31

What it wasn't told, it asks.

A gutted bath needs a tub or a shower, and nobody said which. Brix holds those lines open and asks while the contractor is still standing on the floor in question. It never fills a gap with a guess.

The truck, 2:41

Review it. Corrections stick.

A line with no rate on file is flagged, not priced. Type the number once and the price book keeps it, so the next estimate needs one less edit.

The driveway, 2:47

Send it before the homeowner is back inside.

Brix proposes; the contractor disposes. Nothing leaves under their name unread.

What you say becomes what it costs.

A phrase maps to a named assembly. The assembly expands into its lines. Every line is priced from A101's own price book, never a generic catalog. If a line has no rate on file, Brix flags it and waits.

1. Said on site
2. Assembly
Assembly subtotal$0
3. Priced from A101's book
demo.bathDemo, full bath$1,850 ea
disposal.loadDumpster and disposal$950 load
prep.dustDust protection$180 ea
frame.partitionPartition framing$95 / ft
plumb.relocateRough plumbing, relocate$1,900 ea
elec.relocateElectrical, relocate$550 ea
drywall.patchDrywall and patch$680 ea
tile.boardCement board$4 / sq ft
tile.waterproofWaterproofing$320 ea
tile.install.floorFloor tile install$18 / sq ft
tile.mat.midTile, mid-grade$6.50 / sq ft
door.shower.framelessShower door, framelessno rate

The proposal is ready before the truck is.

A101 ConstructionResidential remodeling, licensed and insured
Proposal 26-0912
September 2, 2026
Valid 30 days

Bathroom renovation

Prepared for the Hollis residence, 14 Hollis Rd, primary bath

Full gut of the existing bath. Relocate the vanity wall to open the floor plan, new tub with tiled surround and frameless door, new tile floor, and a mid-grade fixture package throughout. Permit, disposal, and supervision included.

ScopeQtyAmount
Demo and prep$2,980
Vanity wall relocation8 ft$3,890
Floor tile40 sq ft$1,460
Tub and surround90 sq ft$6,655
Fixtures and finishes, mid-grade$5,250
Finish, permit, and supervision12 days$4,625
Total$24,860
Payment50% on acceptance, 40% at rough-in inspection, balance on completion.
Schedule12 working days from permit. Client selections due before demo.
Homeowner signature
Accept and sign

How it's built

A phone app, a transcriber, one model, and a price book the contractor owns.

The field appReact Native. One screen, one button, push to talk.
Speech to textTranscription runs as the contractor talks.
Speech to scopeAn LLM turns phrases into named assemblies and asks about anything it was not told.
Scope to linesAssemblies expand into line items, each with a quantity and a rate from the book.
The price bookPostgres. One book per contractor, never a generic catalog. A rate typed on site is saved for the next job.
The documentThe proposal is rendered from the estimate and sent from the phone.